Made a start on the cage yesterday. Attempts at using a jigsaw to cut my 18mm MDF failed so my brother ended up resorting to a handsaw. The cuts were straight enough but the edge ended up off at an angle rather than flat.

We got the base, back, and sides cut for the bottom section and then tried planing and sanding to bring the edges flat. Didn't work out so great. It doesn't matter so much with the edges which will be facing outwards but the ones that butt up on the inside need to be as flat and straight as possible.

This morning it was down to Argos for a circular saw to see if I could get a better cut. A bit of practice on some scraps of chipboard and things were looking good… then the heavens opened. Hailstones, thunder, lightning, and massive raindrops put a stop to plans for the rest of the day.

Hopefully the weather will be better tomorrow. Then all I need is to figure out how to cut across a 4 foot MDF sheet with the circular saw?

Comments

Popular posts from this blog

DIY Cage Versus the Degu Menace

Every time I open the cage door Myka Degu takes a bite sized chunk out of the edge of the MDF. It's a little bit of an oversight on my part as I didn't think It would need protecting as they can only get at the edge when the door is open. I've left repairing it for as long as possible but the tools had to come out today as it's too bad to ignore any longer. I actually watched her pull a piece off with the door shut!

Dozing Degus

I can't believe I've had my degus for a month tomorrow. I've been a little busy with work this past week but I thought I'd take time out to share a little video my brother took of the girls chillaxing on Saturday afternoon. About 30 seconds in I open the door for a better view. Enjoy!

The Big Degu Cage Build - Part Four

The cage is progressing nicely. The bottom section is almost complete. Still have the vinyl tiles (for extra protection against pee) to put in, one level to cut and attach, and some small platforms which will help form a ramp up to the top section of the cage. I have a deep 30cm mess guard which will form the basis of a makeshift digging pit and landscaped area. There will be one level and you can see the hole for access to floor 2 which will be in the top section. It was supposed to be in the back but it was going to be a nightmare to do because of the build being in 2 parts so it can be taken apart for easier moving. This means that I now have to rethink my first level. It was going to be set back slightly from the front but I may have to bring it closer to eliminate the massive drop and reduce injury should there be a fall. I'm going to have a look at some other DIY cages for some ideas but the main priority tomorrow is to get the main construction of the top section comp...